On a busy construction site, a temporary road quickly becomes part of the day-to-day operation. HGVs, deliveries and plant depend on it throughout the job, and the demands on the route change as traffic moves around the site.
Temporary road mats need to be planned with that level of use in mind
Heavy plant might be able to cross firm grassland or an unmade yard without causing an immediate problem. The damage can build once the same machine is turning, reversing and working over the same patch day after day, particularly if the ground gets wetter as the job goes on.
That’s where ground protection mats start doing more than providing access. They spread the load where the machine is actually working and help limit damage to the ground underneath. Less damage now generally means less remediation or reinstatement once the job’s finished.
The important question isn’t just how many vehicles will use the route, but where the heaviest use will be.
Turning points by compound gates, passing places, loading areas and sections where wagons queue can take far more traffic than the stretches between them. Concrete wagons, muck-away lorries, tracked plant and other site traffic all add to the use of those same high-traffic areas, concentrating the demand on the matting.
That’s a better starting point than assuming every stretch of the route sees the same amount of traffic.
A route can still look fine to drive on while the ground underneath is quietly taking a hammering. That becomes more of a consideration on routes expected to stay in use for weeks or months, particularly where ground conditions are likely to deteriorate in wetter weather.
Timber mats spread the load over a wider area and help protect the ground beneath the route.
Ground conditions can also vary along the route. One section might cross firm existing ground while another runs over softer or wetter areas, so the same construction ground protection specification may not be appropriate throughout.
Early groundworks might load one section of a site heavily while the rest sits quiet. As the job moves into structure and fit-out, that pattern can shift.
Different areas start carrying the traffic. The original haul road sees less use. A compound access needs to stay live long after the main route’s been lifted.
Where those changes are known in advance, the matting supply can follow the programme rather than assuming the full requirement needs to arrive on day one. Phased deliveries can put the required quantities on site as different areas come into use.
A site plan or marked-up drawing gives us the route dimensions, but the traffic information is what puts those dimensions into context.
The mix of HGVs and plant, expected frequency of use, turning and queuing areas, ground conditions and which sections need to be live at the same time all help build up the requirement.
From there, we can work through mat type, coverage and quantities, with different specifications where required and supply phased around the programme.
Got a route on site that’s going to see sustained traffic through the build? Give us a call with the plant mix, traffic pattern and programme and we’ll plan what it needs.