Project Overview:
In early 2024, GJ Mats were called upon to support Boskalis on a critical coastal defence project at Hengistbury Head in Dorset, a designated Site of Special Scientific Interest (SSSI). The project formed part of Bournemouth, Christchurch and Poole Council’s coastal protection strategy and was focused on reinforcing local sea defences while safeguarding and enhancing marine biodiversity.
The scope of works involved the installation of a 150-metre-long rock groyne at the foot of the headland, supported by the placement of over 30,000 tonnes of granite boulders. The construction included innovative reef structures under Boskalis’ Artificial Reefs Programme, with individual granite rocks weighing between 6 and 10 tonnes.
Our role was to supply and coordinate the delivery of 2,200m² of heavy-duty ground protection matting for the safe movement of machinery, some of which weighed up to 125 tonnes, across the fragile SSSI beach terrain.

Challenges
This project presented complex challenges, both in terms of the large volume of mats required and the environmental sensitivity of the site:
- Protecting Fragile Habitats: As we were dealing with an SSSI nature reserve, it was essential to protect the fragile habitat, particularly as the site is home to the Natterjack Toad, one of the UK’s rarest species.
- Logistics: We had to factor in significant space constraints when planning the delivery logistics. The only place to offload and collect mats was via a small car park near the access point. With such tight movement restrictions, we had to carefully stagger our deliveries to ensure maximum efficiency.
- Safety and Stability: Moving extremely heavy equipment over sandy beach terrain posed serious risks. Our timber mats needed to provide secure, non-disruptive access routes able to withstand immense loads without shifting or sinking.
Solutions
Our coordination team worked closely with Boskalis to ensure seamless scheduling, phased delivery and on-site handling. Thanks to our expertise in managing large consignments with a 24-hour UK turnaround, we provided:
- 1,500m² of 5m x 1m x 200mm Ekki Timber Mats
- 700m² of 5m x 1m x 100mm Ekki Timber Mats
With our robust bog mats in place, three 110-tonne long-reach excavators were able to safely carry out the precision placement of the immense granite rocks required for the groyne and reef construction. The strength and reliability of our Ekki mats were pivotal in providing safe, stable access for these extreme loads while safeguarding the vulnerable habitat.
Clear communication was a critical factor in this project’s success. Our team’s ability to co-ordinate closely with our partners on every detail enabled the rapid deployment and timely collection of all mats, directly contributing to the works being completed ahead of schedule and within budget.

Key Highlights
Exclusive Supply Capability
GJ Mats was the only UK supplier able to fulfil the large volume requirement of heavy-duty premium Ekki mats for this project.
Multi-Phase Precision Logistics
We delivered and collected 17 articulated loads of matting within three days under tightly controlled site access and environmental protocols. This was carried out within two major mobilisation windows (March and December 2024) to align with the client’s phased programme.
Eco-Conscious Groundwork
Our durable, reliable Ekki mats enabled heavy plant tracking across an SSSI without damaging sensitive ecosystems.
Delivering More Than Just Ground Protection
At GJ Mats, we’re proud not just of the service and products we deliver, but of the part we play in projects that protect the environment and strengthen the UK’s most biodiverse habitats.
Contributing to long-term coastal defence at Hengistbury Head is just one example of how we combine practical support with environmental responsibility.